3WLA vs Excel and Google Sheets for look-ahead schedules
Most look-aheads start in a spreadsheet, and for good reason: everyone has Excel and it bends to fit any format. Here is an honest look at where spreadsheets work, where they start costing time, and what 3WLA does differently.
Updated 13 November 2026 · 5 min read
At a glance
| Topic | Excel or Google Sheets | 3WLA |
|---|---|---|
| Cost | Usually already paid for | Free for 1 project; Pro $49/month for 5 |
| Getting started | Build or find a template | Sample project at sign-up; paste rows from Excel |
| Bars and calendar | Conditional formatting or shading by hand | Gantt, calendar and list views from the dates |
| Work days and holidays | Formulas you maintain | Set per project; durations count working days |
| Sharing with subcontractors | Email the file, or a link people can edit | Read-only link or issued email; no account needed |
| Latest version | Whoever saved last | One live schedule; each issue is a frozen copy |
| What changed | Compare by eye | Change summary since the last issue |
| Several people editing | Google Sheets, or Excel files in OneDrive or SharePoint | Autosave, row-by-row merge, see who else is in it |
| Phones | Hard to read on a small screen | Task cards with quick progress updates |
| Permissions | Whole file | Viewer, editor or admin on each project |
| Flexibility | Any layout, any formula | Built for look-aheads, so less free-form |
When a spreadsheet is the right call
- One person keeps the plan and prints it for the meeting.
- A single small job with a handful of trades.
- Your company template feeds other reports you can't change yet.
- You need custom calculations a scheduling tool doesn't do.
When teams outgrow it
- Several superintendents or PMs edit the same plan.
- Subcontractors ask every week which version is current.
- You need a record of exactly what was issued, and when.
- The owner wants to know what changed since last week.
- Foremen want to check the plan, or update progress, on site.
Switching takes minutes
Start free
Sign up and you land in a sample project with a dated look-ahead, so you can see how it works.
Create your project
Add the job details and its work week and holidays.
Paste your rows
Copy Task ID, activity, trade, start, finish and progress % from your spreadsheet and paste into the grid.
Issue it
Send it to your distribution list or share a read-only link. Next week, roll it forward instead of rebuilding it.
Common questions
Can I get my schedule back out into Excel?
Yes. Every schedule exports to CSV, which opens in Excel, and prints to a PDF with a Gantt chart.
Can I keep my current template?
Keep using it to collect information if you like. 3WLA takes the six core columns by paste, so moving a plan across is quick.
Do subcontractors need an account?
No. Read-only links and issued schedules open without an account. Invite them only if they should edit.
Run your next look-ahead in 3WLA
Free for one project, with unlimited people. Paste your rows from Excel, then issue the same schedule to every trade by email or read-only link.
Keep reading
- GuideExcel vs construction scheduling softwareWhen Excel is enough for construction scheduling and when to switch: a decision framework for team size, projects, versions, collaboration, logic and reporting.
- Free template3-week look-ahead template (Excel)Free 3-week look-ahead template for Excel and Google Sheets: a 21-day bar chart that fills itself in, work days, progress and notes. No sign-up.
- Comparison3WLA alongside Primavera P6 and Microsoft ProjectP6 and Microsoft Project run the master schedule; 3WLA runs the 3-week look-ahead beside it. What each is for and how to keep them in line.