Free 3-week look-ahead schedule template
An Excel template for planning the next 21 days on site. Type the start date and your tasks; the bars, work days and day headings fill themselves in. It opens in Excel, Google Sheets, Numbers and LibreOffice, and there is nothing to sign up for.
Updated 13 November 2026 · 4 min read
What's in the template
- A header for the project, superintendent, issue number and the look-ahead start date.
- 40 task rows: Task ID, activity, trade or subcontractor, start, finish and progress %.
- Work days worked out for you (Monday to Friday) from the start and finish dates.
- A 21-day bar chart that shades each task between its start and finish, with weekends greyed out.
- A notes column for constraints: materials, inspections, access, open RFIs.
- Set up to print on one landscape page.
How to fill it in
Set the start date
The Start cell shows this week's Monday. Type a different Monday to plan another window; the day headings and bars move with it.
Pull the work from the master schedule
List everything that starts or is in progress in the next three weeks. Break long activities into tasks a crew can finish in a few days to a week, by area or floor.
Give every task one owner
Put the trade or subcontractor responsible on each row. If two trades share a task, split it.
Write down what could stop it
Use the notes column for anything not ready yet: materials, equipment, inspections, design answers, access. Each one needs a person and a date.
Update it every week
Record progress, note why anything slipped, change the start date to next Monday and add the new third week.
Copy it into 3WLA when you're ready
The first six columns (Task ID to Progress %) are in the same order as the 3WLA schedule grid. Select those rows in Excel, copy, click the first Task ID cell in a 3WLA schedule and paste. Dates can be YYYY-MM-DD or MM/DD/YYYY.
3WLA works out durations from each project's own work week and holidays, keeps one current version that everyone can open, and issues it to your subcontractors by email or read-only link.
When a spreadsheet starts costing time
- Several people edit their own copies and nobody is sure which is current.
- Subcontractors ask for the latest version every week.
- You need a record of exactly what was issued, and when.
- The owner asks what changed since last week's look-ahead.
- Foremen want to check the plan on their phone.
Common questions
Is the template really free?
Yes. Download it and use it on as many projects as you like. No account and no email address needed.
Does it work in Google Sheets?
Yes. Upload the file to Google Drive and open it with Google Sheets. The formulas and the bar shading come across.
Can I change the work week?
The template counts Monday to Friday as work days. In 3WLA you can set each project's own work week and holidays, and durations follow them.
How many tasks does it hold?
40 rows are set up. To add more, insert rows above the last one and copy the row above down; the bars and the work-day formula come with it.
Run your next look-ahead in 3WLA
Free for one project, with unlimited people. Paste your rows from Excel, then issue the same schedule to every trade by email or read-only link.
Keep reading
- GuideWhat is a 3-week look-ahead schedule?What a 3-week look-ahead schedule is, who prepares it, what goes in it and how it connects to the master schedule, with an annotated example.
- GuideHow to run a weekly look-ahead meetingA simple agenda for the weekly look-ahead meeting: who attends, what to review, and how to log constraints and get commitments from every trade.
- Comparison3WLA vs Excel and Google SheetsSpreadsheets compared with 3WLA for 3-week look-ahead schedules: building the plan, sharing it with subcontractors, keeping one version, phones and cost.